Get $3,000 OFF Your Kitchen Remodel or $2,000 OFF Your Bath Remodel! Financing Offers Available!* Schedule a Free Consultation

Finished high-end bathroom remodel in Tampa with a custom tiled shower, freestanding tub, and double vanity by CMK Construction
Bathroom Remodel Costs · Tampa Bay

What a Bathroom Remodel
Costs in Tampa

Real ranges by project type, what every CMK number includes, and what moves the price up or down. No teaser figures, no allowance games. Tampa Bay's most-awarded bathroom remodeler since 2004.

Real Numbers by Project Type

Tampa Bathroom Remodel Cost Ranges

Every bathroom is priced from its own measurements and selections, but after two decades and thousands of Tampa Bay projects, the ranges are consistent. Here is where most CMK bathroom remodels land.

Remodeled guest bathroom with a new tub and shower surround, white vanity, and fresh tile by CMK Construction

Guest & Hall Baths · $15,000–$30,000

A new tub or shower, vanity, toilet, tile, and fixtures in the existing footprint. The layout stays put, which is exactly what keeps this tier where it is. Most run two to three weeks of on-site work.

Primary bathroom remodel with a custom tiled walk-in shower, freestanding tub, and double vanity by CMK Construction

Primary Baths · $30,000–$55,000

A full gut of the room: custom tiled shower with glass, a freestanding or drop-in tub, double vanity with stone tops, new flooring, and lighting. Plumbing generally stays close to where it started.

Full primary suite bathroom remodel with a wet room, floor-to-ceiling tile, and a custom double vanity by CMK Construction

Full Primary Suites · $55,000–$90,000+

Wet rooms, moved walls, relocated plumbing, floor-to-ceiling tile, and high-end fixtures and stone. This is the tier where the bathroom is redesigned rather than replaced in place.

Want the deep dive with per-square-foot breakdowns and project examples? Read the full Tampa bathroom remodel cost guide.

CMK Construction designer reviewing finish selections and project pricing with a homeowner during the design phase

What Every CMK Number Includes

A price is only useful if it covers the whole job. CMK proposals are fixed and written, and they include the parts other quotes leave out and add back later.

  • The complete job, one contract

    Demolition, labor, materials, plumbing and electrical under our own licenses (CFC 1430533, ER 13016498), permits, and inspections. Not a labor-only figure with the rest to be determined.

  • Daily project management

    A project manager runs your job day to day, keeps the schedule honest, and answers the phone. That is built into the price, not an upsell.

  • A warranty behind the work

    Every project carries CMK's one-year Peace of Mind Warranty on workmanship, on top of the manufacturer warranties on the products themselves.

What Moves the Price Up or Down

Two bathrooms the same size can land tens of thousands of dollars apart. These are the decisions and discoveries that separate them.

Shower walls covered in bonded orange Schluter waterproofing membrane with banded seams, before tile, on a CMK Construction bathroom remodel in Tampa
The work behind the tile is in every CMK price. Skipping it is how a low quote turns into an expensive repair.
  1. Layout and plumbing moves

    Keeping fixtures where they are is the single biggest cost control. Moving the toilet, relocating a drain, or opening a wall adds plumbing, framing, and inspection scope.

  2. The wet area's construction

    A custom tiled shower with a mortar pan, bonded Schluter waterproofing, and glass costs more than a prefab surround, and it is built to outlast one. The wet area typically carries the largest share of the budget.

  3. Tile scope and finishes

    Floor-only tile versus wainscot versus floor-to-ceiling changes both material and labor. Natural stone, large-format tile, and mosaic work sit above standard porcelain.

  4. Vanity, tops, and fixtures

    Stock vanities, semi-custom cabinetry, and custom built-ins each occupy a different band, and the spread on faucets, shower valves, and lighting is wider than most homeowners expect.

  5. What demolition uncovers

    Rotted framing, failed subfloor, and corroded cast-iron drains have to be repaired before anything new goes in. We price honestly up front and put any discovered work in writing before it happens.

You Do Not Have to Pay for It All at Once

CMK offers financing options on bathroom remodeling projects, and many homeowners use them to spread the investment out instead of draining savings. Your consultant walks you through the current offers at your free consultation, with the terms in writing.

  • Financing options available on bathroom remodeling projects
  • Current promotions and terms explained before you sign anything
  • A fixed proposal first, so you are financing a real number, not an estimate
  • See current financing offers and all CMK offers
Tampa homeowners reviewing bathroom finish selections with a CMK Construction designer during their project's design phase

400+ Verified Reviews. 4.8 Stars.

The price only matters if the job gets done right. Here is how the work holds up.

★★★★★

"I am so happy with my bathroom and shower. Barry is my project manager and he was awesome, always answering my calls and questions and ensuring the work was high quality on top of all phases. Loved the whole process."

Kathleen Sackett
Tampa · Bathroom & Shower
★★★★★

"We completed 2 bathroom remodels through CMK and couldn't be happier with how the process went and the final product! They made sure we always had a working toilet and shower during the process, since we lived here during the remodel."

Christie McGhee
Two Bathroom Remodels
★★★★★

"My husband and I had our Owner's Suite bathroom remodeled and are thrilled with CMK and the work performed under Project Manager Barry. He and his hard-working crew showed up on the days he said they would."

Robbin Lacey
Owner's Suite Bathroom

Read all 400+ reviews →

Why CMK Construction

Why the Price Comes With Fewer Surprises

One licensed company carries the whole job, so the number on the proposal is the number one team is accountable for.

Schluter Waterproofing on Every Bathroom

Lifetime-warranted waterproofing membrane installed under every tile we lay. No paint-on membranes, no skipped steps. Built to last 30+ years in Florida's humidity and salt air.

6x Tampa Bay Times Best of the Best

Named People's Choice Best of the Best every year from 2020 through 2025. Voted on by the Tampa Bay community, not a panel of judges.

CMK Design Studios

After your project begins, you select every tile, vanity, fixture, and finish in person at a CMK Design Studio. Nothing is ordered until you approve it.

Dedicated Project Manager on Every Job

You get a dedicated, named project manager who visits your home and will communicate with you directly.

Licensed Plumbing & Electrical

Licensed plumbing and Registered Electrical Contractor ER 13016498. Our plumbers and electricians are on every CMK bathroom remodel, start to finish.

Peace of Mind Warranty

Every CMK project is covered for one full year on all workmanship and materials. If something isn't right, we make it right. No arguments, no extra charge.

Other Service Areas

Communities We Serve

CMK Construction serves homeowners across Hillsborough, Pinellas, Pasco, Manatee, and Sarasota Counties. Explore other communities we serve.

Common Questions

Bathroom Remodel Cost FAQ

Most CMK bathroom remodels in Tampa fall between $15,000 and $55,000. A guest or hall bath with a new tub or shower, vanity, and tile typically runs $15,000 to $30,000. A primary bath with a custom tiled shower, freestanding tub, double vanity, and new flooring runs $30,000 to $55,000. A full primary suite with a wet room, layout changes, and high-end finishes starts around $55,000 and can exceed $90,000. Your exact number comes from a free in-home consultation, not a formula.

A realistic starting point is about $15,000 for a guest bath and $30,000 or more for a full primary bath with a custom shower, stone countertops, and new tile. A common guideline is to set aside 5 to 10 percent of your home's value for a major bathroom project. Whatever the figure, CMK gives you a fixed proposal during the design phase, so you know the full investment before any work begins.

Everything it takes to finish the room: demolition, labor, materials, plumbing and electrical work under our own licenses, permits and inspections, daily project management, and CMK's one-year Peace of Mind Warranty on workmanship. There are no allowance placeholders that balloon later. If the scope changes because you change your selections, the price changes in writing before the work happens.

Moving walls or relocating plumbing, converting to a wet room or curbless shower, tile work that wraps the whole room, and upgraded fixtures or natural stone all push the number up. Hidden damage is the other driver: rotted framing or corroded drain lines found during demolition have to be repaired before anything new goes in. Keeping the existing layout is the single biggest way to control cost.

Yes. CMK offers financing options on bathroom remodeling projects, and many homeowners use them to spread the investment out rather than paying everything up front. Terms and current offers change, so your consultant will walk you through what is available when you schedule your free consultation.

Schedule a free in-home consultation. An estimator measures your actual bathroom, checks the plumbing layout and what is behind the walls where possible, and talks through what you want to change. From there you get a written, fixed proposal, not a per-square-foot guess. Because CMK holds its general contracting, plumbing, and electrical licenses in house (CGC 1516665, CFC 1430533, ER 13016498), the proposal covers the whole job under one contract.

Related: the full Tampa bathroom remodel cost guide, custom bathrooms, showers, tub-to-shower conversions, and bathtubs.

Ready to Start Your Project?

Schedule a free in-home consultation. No obligation, no high-pressure pitch.

Free in-home estimate. No obligation.